Assembly Hall

Project Number: 10686
Estimated Budget: $12,070,000
Construction Est. Start: 8/22/2007
Construction Est. End: 7/15/2008
Architect: Thomas Hacker Associates
Project Manager: Catherine Vogt
Construction Manager: Pat Brown

This project will replace the existing UW Tacoma facility know as the "Dawg Shed" with a new 20,250 gross square foot Assembly Hall to meet the need for a large multi-purpose gathering space. The site is east of the library, flanked on the south by the Cherry Parkes building, to the north by the Walsh Gardner building and to the east by Pacific Avenue. The building will function as an assembly space for lecture events, banquets, career fairs, and student exhibits. At other times the space will be used as a student commons for studying and as a student gathering place. Three multipurpose collaboration rooms are included. The facility will include storage space, service kitchen, toilet rooms and audio visual facilities necessary to support various gatherings of about 350 to 500 persons. The ground floor space on Pacific Avenue will be constructed as a pedestrian-oriented retail space.

Documents

Architectural Renderings

Click on an image below for a larger version:

Pacific Avenue facade Various views

Design Drawings

Click on an image below for a larger version:

Floor plans Pacific Avenue elevation Commerce Street elevation
up arrowtop